To Alleviate the Suffering of the Syrian People
Syria Recovery Trust Fund
Recovery Programme

Installation of Solar Power Generation Units in a City of Dar’a Governorate
Syria’s power generation system and national electricity grid suffered a great deal of damage since the outbreak of the conflict. Consequently, the country’s power generation capacity was reduced by about 75%. Power supplies to a large number of urban and rural areas, including the target city of this project, were reduced considerably. The city’s main supply sources, a 20kv feeder grid line and 66/20kv substation, were largely affected and are c...

Solid Waste Removal and Management in Aleppo City - Phase I
With the start of the conflict, the regime ceased any allocation of funds to support waste collection and management services. This has resulted in the termination of such services to the detriment of sanitation and hygiene standards in the city. As fighting continued, most of the equipment of the solid waste sector were misappropriated and used as barricades during the fighting. The overall lack of waste management has led to the spread of bad o...

Solid Waste Management and Rubble Removal in 10 Communities in Hama Governorate
Following the outbreak of the conflict, debris and rubble accumulated as a result of the repeated shelling of cities. The lack of heavy machinery to rehabilitate water mains, remove debris, open roads, and clean city squares exacerbated the situation. As the conflict continued, waste containers were misappropriated, used as barriers during clashes, and destroyed. As a result, waste has been piled into mounds while health problems and diseases spr...

Rehabilitation and Expansion of the Electricity Grid of a Town in Aleppo Governorate
The low voltage grid in the selected township is old and in need of rehabilitation. It also needs to be expanded due to recent urbanization and an increasing number of internally displaced persons. Furthermore, the township was indirectly affected by air strikes that led to the burning of many transformers, circuit cutters, cables, aerial conductors, fuses, poles holding the grid, and other relevant equipment. Due to a lack of spare parts, equi...

Installation of Solar Power Generation Units in a City of Dar’a Governorate
Syria’s power generation system and national electricity grid suffered a great deal of damage since the outbreak of the conflict. Consequently, the country’s power generation capacity was reduced by about 75%. Power supplies to a large number of urban and rural areas, including the target city of this project, were reduced considerably. The city’s main supply sources, a 20kv feeder grid line and 66/20kv substation, were largely affected and are c...

Solid Waste Removal and Management in Aleppo City - Phase I
With the start of the conflict, the regime ceased any allocation of funds to support waste collection and management services. This has resulted in the termination of such services to the detriment of sanitation and hygiene standards in the city. As fighting continued, most of the equipment of the solid waste sector were misappropriated and used as barricades during the fighting. The overall lack of waste management has led to the spread of bad o...

Solid Waste Management and Rubble Removal in 10 Communities in Hama Governorate
Following the outbreak of the conflict, debris and rubble accumulated as a result of the repeated shelling of cities. The lack of heavy machinery to rehabilitate water mains, remove debris, open roads, and clean city squares exacerbated the situation. As the conflict continued, waste containers were misappropriated, used as barriers during clashes, and destroyed. As a result, waste has been piled into mounds while health problems and diseases spr...

Rehabilitation and Expansion of the Electricity Grid of a Town in Aleppo Governorate
The low voltage grid in the selected township is old and in need of rehabilitation. It also needs to be expanded due to recent urbanization and an increasing number of internally displaced persons. Furthermore, the township was indirectly affected by air strikes that led to the burning of many transformers, circuit cutters, cables, aerial conductors, fuses, poles holding the grid, and other relevant equipment. Due to a lack of spare parts, equi...