To Alleviate the Suffering of the Syrian People
Syria Recovery Trust Fund
Recovery Programme

Solid Waste Management in 10 Communities in Aleppo Governorate
With the start of conflict, the solid waste management sector was badly affected. As fighting continued, equipment from the solid waste sector has been misappropriated and used as barricades. Local communities have been paying the price not only in terms of human casualties but also in the deterioration or complete cease of social and public services. In particular, the lack of efficient sanitation services has led to the spread of diseases, in...

Rehabilitation and Maintenance of High voltage Grid in Selected Areas of Aleppo Governorate
Since the start of the conflict and due to the lack of resources, the equipment of the high voltage transmission has not been sufficiently maintained and is at a high risk of failure for some areas in Aleppo Governorate. Without the planned preventive maintenance of the high voltage sub-stations there are frequent break-downs, which result in major power outages for a large number of households and other consumers. One of the main infrastructur...

Filling the Void
In response to the urgent needs of local communicties in newly liberated areas, the SRTF developed a rapid response mechanism to deal with the extensive damage incured by public services and infrasgtructure. Much of the damaged infrastructure affects sectors that the SRTF seeks to rehabilitate (i.e., water and sanitation networks, waste management services, health services, electricity networks, and educational facilities). The “Filling the Voi...

Rehabilitation of an Electricity Grid in a City in Idleb Governorate
Electricity transformers have burned, cables have gone missing, and electrical relays and other equipment have been destroyed or are in need of severe repair. Without electricity, water pumps do not function, food production is reduced, and there is a meager provision of health care services and other public goods such as post offices and communications facilities. The objective of this project is to restore the electricity service in the proje...

Solid Waste Management in 10 Communities in Aleppo Governorate
With the start of conflict, the solid waste management sector was badly affected. As fighting continued, equipment from the solid waste sector has been misappropriated and used as barricades. Local communities have been paying the price not only in terms of human casualties but also in the deterioration or complete cease of social and public services. In particular, the lack of efficient sanitation services has led to the spread of diseases, in...

Rehabilitation and Maintenance of High voltage Grid in Selected Areas of Aleppo Governorate
Since the start of the conflict and due to the lack of resources, the equipment of the high voltage transmission has not been sufficiently maintained and is at a high risk of failure for some areas in Aleppo Governorate. Without the planned preventive maintenance of the high voltage sub-stations there are frequent break-downs, which result in major power outages for a large number of households and other consumers. One of the main infrastructur...

Filling the Void
In response to the urgent needs of local communicties in newly liberated areas, the SRTF developed a rapid response mechanism to deal with the extensive damage incured by public services and infrasgtructure. Much of the damaged infrastructure affects sectors that the SRTF seeks to rehabilitate (i.e., water and sanitation networks, waste management services, health services, electricity networks, and educational facilities). The “Filling the Voi...

Rehabilitation of an Electricity Grid in a City in Idleb Governorate
Electricity transformers have burned, cables have gone missing, and electrical relays and other equipment have been destroyed or are in need of severe repair. Without electricity, water pumps do not function, food production is reduced, and there is a meager provision of health care services and other public goods such as post offices and communications facilities. The objective of this project is to restore the electricity service in the proje...